Haulotte is involved with Cambodia’s Second Aeon Mall Sen Sok City Construction

 

compact_10_aeon_mall_ii_1_cambodia_0.jpg

Compact 12 is used to assist workers on ventilation works.

 

Cambodia’s second giant Aeon Mall Sen Sok City in Phnom Penh, is expected to complete construction in 2018. Aeon appointed Hyundai Engineering for the construction of a four-storey mall with an area of 151,000 sqm, larger than the first mall.

Leased out by TWS Trading, Haulotte machines including Compact 12 scissor lift and HA18SPX are being used to assist on ventilation works and structural works.

Compact 12 scissor lift is a robust, reliable, easy to maintain machine that gives an exceptional productivity, allowing a working height of 11.98m and lifting load capacity of up to 450 kg which both inside and outside use with the same load capacity. It also consists of an extended platform of 0.92m and allows long working cycles.

 

ha18spx_aeon_mall_ii_2_cambodia.jpg

Workers doing structural steel works are using HA18SPX articulating boom lift.

 

With optimal productivity, HA18SPX articulating boom lift features full proportional controls and simultaneous boom functions that lift to full height in 44 seconds. It also has outstanding rough terrain driving features and provides a working height of 17.2m and 10.6m horizontal outreach that provides a large working envelope. The machine is also a 4 wheel drive providing greater manoeuvrability.

Once completed, the mall will have large departmental store, movie theatres, a bowling alley, high-end retail outlets, restaurants, pubs and food malls.